Friday, 26 October 2012

Semester 2'2012 - Week 12 -13 [Poster Design]

This two weeks (15 October - 26 October) is where I will preparing and presenting my poster in front of my supervisor Sir Mohd Azlan Abu (MAZA) for preparation for Industrial Day presentation where I will be assessed. Below are the poster which will be presented in the Industrial day after receiving permission from Azlan for the poster is finally suffice for my assessments.


But with some lacking with the output control table, Sir Azlan request me to redesign the system for lighting system together with new poster table.

During the week 13 I have done the redesign as two figures below and the third is the final posters.

The figure above are new design of block diagram together with annotation for reader guides to understand the system design parameters.

Above is the final GUI to be presented


Above are the finall poster draft for printing and ready to be presented in Industrial Day.


Friday, 12 October 2012

Semester 2'2012 - Week 11 [Compiling Design]


After week s of designing work and troubleshooting problem regarding the system design, I finally reach the final phase of combining all system I have design before into one system. The results are shown below.



After complete the design compiling, I finished the re touch on graphical user interface for my system as shown below.


Thus with the system is complete, week 12 will be my preparation for poster finalizing before going for presentation in Industrial Week in week 14.

Friday, 5 October 2012

Semester 2'2012 - Week 10 [Light System]

After successful in designing the Window system from last week, I proceed with designing the lighting control system. From figure below are the design of Labview block diagram the lights of a building.


The system above functions as follows:-

The purpose of this system is to control the lighting of the building. It controls by receiving input from IDS or indoor sensor, ODS or Outdoor sensor and DN sensor or day night sensor. All of the input sensors are to measure the illumination of light inside a build. The process of the system is whenever the inside of the building illumination is low, the light will be brighter. As the illumination getting brighter inside the building, the lights will become dimmer. Depends on situation of day or night also affect the system by during day, light maximum brightness only can reach medium range. But during night the minimum brightness will be the medium range.