Friday, 16 November 2012

Semester 2'2012 - Week 16 [Final Report Making]

Alhamdulillah after a great week last week, I was able to impressed my assessors for finding them a little interest toward my projects.

With the assessments done, it is finally the last hurdle for my final year project work. Which is the final report. The report must be in correct formats as attached in the links:-

https://www.facebook.com/download/374961645921833/FORMS.rar.

All submission for drafts work must be sent to my Adviser Sir Mohd Azlan Abu on Monday 19th November next week.

The submission that must be submit is:-


  1. Final Report
  2. Technical Paper
  3. Video of projects
  4. Abstract
  5. FYP picture
  6. Labview Programs
  7. Posters

Wednesday, 7 November 2012

Semester 2'2012 - Week 15 [Industrial Day]

This is the day where all students of all UniKL -BMI presenting their final year projects for final assessment and grading. I was assessed by Associates Professor Zulkifli Abdul Kadir Bakti (ZABK) and Madam Norhaslinawati BTE Ramli. May Allah give me strength and wisdom to pass these trials.

With tomorrow is the big day, I would like to say Alhamdulillah and thanks to Allah the most kindness and merciful which have guide my final year project. I also would like to extend my highly appreciation to my advisor Sir Mohammad Azlan Abu (MAZA) for enlighten and guiding me to finish my final year project from final year project 1 to final year project 2. All knowledge sir shared has undoubtedly enriched my understanding of these project and my presentation skills.

I also would like to thank to all members under Sir Azlan guidance for support and assisting me with all the information and knowledge shared I was able to finish this project within schedule. Not forgotten, my parents and family members for supporting me with limitless moral support from the beginning of final year project 1 until the end of final year project 2.

Thank you…..

Friday, 2 November 2012

Semester 2'2012 - Week 14 [Presentation Preparation]

During this week all I focus is to improve my presentation skill as I was trained by Sir Mohd Azlan Abu on how to present my paper well. One of the experience my adviser teach me are by presenting in the Asia Pacific Conference for Engineering and Technopreneurs,  ACET convention in Technology Park in Bukit Jalil during 23rd -24th of October. With the experience I trained for the Industrial Day in 8th of November next week. Together with collecting more reference for adding info for my project elaboration.


Friday, 26 October 2012

Semester 2'2012 - Week 12 -13 [Poster Design]

This two weeks (15 October - 26 October) is where I will preparing and presenting my poster in front of my supervisor Sir Mohd Azlan Abu (MAZA) for preparation for Industrial Day presentation where I will be assessed. Below are the poster which will be presented in the Industrial day after receiving permission from Azlan for the poster is finally suffice for my assessments.


But with some lacking with the output control table, Sir Azlan request me to redesign the system for lighting system together with new poster table.

During the week 13 I have done the redesign as two figures below and the third is the final posters.

The figure above are new design of block diagram together with annotation for reader guides to understand the system design parameters.

Above is the final GUI to be presented


Above are the finall poster draft for printing and ready to be presented in Industrial Day.


Friday, 12 October 2012

Semester 2'2012 - Week 11 [Compiling Design]


After week s of designing work and troubleshooting problem regarding the system design, I finally reach the final phase of combining all system I have design before into one system. The results are shown below.



After complete the design compiling, I finished the re touch on graphical user interface for my system as shown below.


Thus with the system is complete, week 12 will be my preparation for poster finalizing before going for presentation in Industrial Week in week 14.

Friday, 5 October 2012

Semester 2'2012 - Week 10 [Light System]

After successful in designing the Window system from last week, I proceed with designing the lighting control system. From figure below are the design of Labview block diagram the lights of a building.


The system above functions as follows:-

The purpose of this system is to control the lighting of the building. It controls by receiving input from IDS or indoor sensor, ODS or Outdoor sensor and DN sensor or day night sensor. All of the input sensors are to measure the illumination of light inside a build. The process of the system is whenever the inside of the building illumination is low, the light will be brighter. As the illumination getting brighter inside the building, the lights will become dimmer. Depends on situation of day or night also affect the system by during day, light maximum brightness only can reach medium range. But during night the minimum brightness will be the medium range.



Friday, 28 September 2012

Semester 2'2012 - Week 9 [Window System]

In new week after holiday, I have continue to expand my design for the self adapt system by combining the previous design for temperature control, with second part of my system which is Window system.




         

              The purpose of window in building services is to provide a quality air quality inside a building by letting natural air to flow from outside into internal parts of the building. Providing good air quality can be achieve by letting go excessive air pressure and humidity of the building outside, and much more power efficient to use the natural wind than using fan out system. Wind sensor plays important role where it detect storm, so the air flow inside the building in comfortable. The rain sensor is to detect rain so the window can be shut during rain to avoid from rain entering the building. From figure above we can see the block for window control which is for ventilation purpose. For this system, the fuzzy control will be receiving inputs from switch temperature, real temperature sensor, wind sensor or anemometer, and rain sensor.