Thursday, 20 September 2012

Semester 2'2012 - Break & Week 8 [Holiday & Exam]

From 15th to 23rd of September are considered as Mid Semester Holiday week. Thus week 8 will continue at 24th September onward.

Regardless week 8 are the week for Mid-Term examination. So this 2 weeks will be no progress as I have to prepare for Mid Semester Exam.

Good luck for everyone in UniKL campus! :D

Thursday, 13 September 2012

Semester 2'2012 - Week 7 [Discussion]

This week I have meet my Adviser Sir Mohd Azlan Bin Abu (MAZA) with me fellow colleagues for final year project which under the supervision of sir MAZA to brain storming for ideas of our projects.

From my design in week 3, my colleagues recommend to use a split signal block to be used on MIMO fuzzy blocks as shown below.


There are no error in design as in week 3, but the result are not as I expected. only Heater meter are showing output results but not Fan. Fan meter only static at Zero the whole process, so I assume its a failure and decide to use my current design shown in week 6.

As for improvement I have gain an idea to put light control and automatic window system to the project. Will be shared on week  8 discussion.

Thursday, 6 September 2012

Semester 2'2012 - Week 6 [New Design]

This week I have finished my basic designer of the project which work well and producing expected results.

The design are as shown below.


From diagram I have made changes from the week 3 problem. Which I made a series of fuzzy logic files but using parallel input for all system. Which mean same input but gives to different decision on each system of fuzzy logic program system.

The output also different for Fan and Heater, thus problem from week 3 are solved.

My target for week 7 are to put more input and output on the system so it can be more versatile to adept to any environment as stated in its title.

Thursday, 30 August 2012

Semester 2'2012- Week 5 [Poster]

Due to some circumstances my Adviser Sir Mohd Azlan Bin Abu would like use made a poster for our presentation in week 14 first draft, which he will comment and critics any lack in the poster info and design.

As for the week I only done the poster as shown below and was accepted by my adviser. Regardless the results part a remain void as my simulation are still not finished.


In the poster are my new block diagram and flow charts which might be different from my entry from week 1 to week 15 of semester S1'2012.

Monday, 20 August 2012

Semester 2'2012 - Week 4 [Hari Raya Break]

Due to Hari Raya Eid Mubarak celebration the whole week are holiday and project progress are on hold.


As for problem from previous week my adviser have given a tips to solve the problem.

For the week I will made two fuzzy system program instead on just one. It will be uploaded after been verified by my adviser Sir Mohd Azlan Bin Abu (MAZA).

Thursday, 16 August 2012

Semester 2'2012 - Week 3 [Progress: Problem 1]

For this week I have fully finished my fuzzy system data which will be use for my Labview simulation block diagram. Thus I have continue to design the block diagram and front panel of Labview.

Labview front panel for prototype 1 is as below:-


   The heater and fan meter show the amount of power,% of the motor used. While arrow of slide properties are to be set by user to see whether the simulation can produce output as expected or not. While Numeric indicator are to shown exact value that the temperature are reading.

But problem occurs at block diagram level which shown as below:-


From picture above we can see MIMO or Multiple Input Multiple Output for fuzzy system design block cannot connect to two output at the same line. The results are failure of output production.

While in use of MISO or Multiple Input Single Output option, only the heater meter are producing output. But Fan consist of no output reading of its own, only the same as Heater reading as shown below.


Thus I need to consult with my adviser regarding the problem.


Thursday, 9 August 2012

Semester 2'2012 - Week 2 [Finalized New Title]

Task:-


  1. During the first meeting with my advisor Sir Mohd Azlan Bin Abu (MAZA), we have finalized the new FYP title for my project.
  2. The form of title change are to be submitted before the end of this week. (10th August 2012)
  3. Update for final year project for UniKL students can be checked at new websites  http://fyp.bmi.unikl.edu.my
  4. Simulation for project to be started.

Results / Summary:-



  1. My latest project title are : Development of Environment Self Adapting System using LabView for buildings.
  2. The form have been submitted at 1315 hour to my adviser office.
  3. All announcement regarding final year project student can be access without lag anymore.
  4. My simulation are stating with Fuzzy Logic System Designer via LabView. Result of this week is shown below.

      

For more data, please kindly email me for more info.